Our Factory Relocation Services Include:
- Dedicated Project Management: Each project is assigned a dedicated project manager who oversees every aspect of the relocation, ensuring seamless communication and execution.
- Comprehensive Health and Safety Documentation: We provide detailed method statements, risk assessments, lift plans, personnel training records, and equipment certifications to maintain the highest safety standards.
- Site Assessments: Regular site visits are conducted to assess project requirements and develop tailored solutions.
- CDM/Health and Safety Management: Our team manages all Construction (Design and Management) regulations and health and safety protocols throughout the project.
- Machinery Services: This includes disconnection, dismantling, match marking, loading, transportation, offloading, positioning, aligning, levelling, and reconnection of machinery.
- Interim Storage Solutions: We offer secure storage at our warehousing facility if needed during the relocation process.
- Floor Preparation: Services such as core drilling are provided to prepare the new site for machinery installation.
- Export, Packing, and Shipping Services: For international relocations, we handle all aspects of export packing and shipping.

